Pre Solicitation NoticeSolicitation Identifier:W9128F24B0016 Bank Stabilization, Lewis and Clark Lake Gavins Point Dam Project.The U.S. Army Corps of Engineers (USACE) Omaha District intends to issue an Invitation for Bid (IFB) on or about 20 June 2024 that will result in one (1) Firm Fixed–Price contract for bank stabilization measures inThe solicitation will close on or about 20 July 2024 and is restricted 100% to Small Businesses only.Project Description:The work will consist of bank and slope protection of approximately 870 linear feet of lake shoreline The work will consist of cutting, regrading, and compacting the existing bank to provide the proper slope for the placement of stone. The contractor will be limited to the designated areas for operations. The estimated construction cost of this project is between $500,000 and $1,000,000.
↧